Anywhere from a few weeks for a minor repair to well over a year for a full rebuild. Here's a realistic timeline for an Australian insurance claim — and why it matters for where your family stays.

Talk to us — 1300 994 554

The short answer

A minor repair — storm damage or a burst pipe affecting one part of the home — might take a few weeks to a couple of months. A major rebuild after a fire or serious structural damage is commonly 9 to 12 months, and sometimes considerably longer.

The building work is often the shortest part. Assessment, scoping, quoting, approvals and builder availability all happen first — which is why families are frequently in temporary accommodation longer than they expected.

A realistic timeline

1–4 weeks

Claim lodged & assessment

The insurer appoints an assessor or builder to scope the damage. Temporary accommodation usually starts around now.

2–8 weeks

Scope of works & quoting

A detailed scope is prepared and builders quote. Complex or disputed claims can add weeks here.

2–12 weeks

Approvals & permits

Structural rebuilds may need council approval, engineering or heritage sign-off before work can start.

6 weeks – 12+ months

Repairs or rebuild

A water-damaged kitchen might be weeks; a full rebuild after a fire is commonly 9–12 months or more.

1–3 weeks

Final inspection & handover

Defects are rectified and the home is signed off before you move back in.

Indicative only — every claim is different. Timelines depend on the extent of damage, your insurer, approvals and builder availability.

Plan for longer than you're told

If there's one thing families consistently tell us, it's that the repair took longer than the first estimate. It's worth choosing accommodation you'd be comfortable in for the realistic timeline, not the optimistic one — moving a family twice is far more disruptive than settling into one home from the start.

That's why our homes are set up for longer stays, and why we make it straightforward to extend when repairs run over. If your temporary accommodation cover is approaching its limit, talk to your insurer early about an extension.

Common questions

How long does an insurance rebuild take in Australia?

It depends heavily on the damage. A minor repair — say a burst pipe or storm damage to one area — might take a few weeks to a couple of months. A major rebuild after a fire or serious structural damage commonly takes 9 to 12 months, and sometimes longer once assessment, approvals and builder availability are factored in.

Why do insurance repairs take so long?

The build itself is often the shortest part. Assessment, preparing a detailed scope of works, getting quotes, council approvals for structural work, and builder availability all add time before a single tool is picked up. Any dispute over the scope or sum insured can add weeks or months more.

What if repairs take longer than my temporary accommodation cover?

This is common — repairs frequently run past initial estimates. If your accommodation cover is approaching its limit, talk to your insurer early about an extension. We also help families manage longer-than-expected stays and arrange extensions on the home where needed.

How long can we stay in one of your homes?

Our homes are set up for stays from a few weeks to many months — the real length of most insurance repairs — with the flexibility to extend when the timeline slips, which it often does.

Settle in for the whole repair

One comfortable, furnished, pet-friendly home for your family — for the real length of your repair, with room to extend. We work directly with you or your insurer.